|
APL owns and operates a petroleum products pipeline (including pumping station and storage) in Pakistan. The pipeline runs from Zulfiqarabad terminal at Pipri, Karachi to Hub, Baluchistan to transport Fuel Oil for HUBCO Power Plant. The facility was constructed at a total capital cost of US $100 million.
-
Pakistan State Oil (PSO)
-
Asia Infrastructure Ltd of Singapore (AIL)
-
VECO International of USA (VECO)
|
|
|